{"id":2797,"date":"2026-08-14T15:18:09","date_gmt":"2026-08-14T13:18:09","guid":{"rendered":"https:\/\/ncacademy.ch\/?p=2797"},"modified":"2026-08-14T15:20:38","modified_gmt":"2026-08-14T13:20:38","slug":"scheduler-production-planner-difference","status":"publish","type":"post","link":"https:\/\/ncacademy.ch\/en\/ordonnanceur-planificateur-production-difference\/","title":{"rendered":"Production planner or scheduler: what are the differences?"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In an industrial company, a breakdown, a delay in delivery, an absence or an urgent order can quickly disrupt the planned schedule. Two functions then come into play to maintain production: the <a href=\"https:\/\/ncacademy.ch\/en\/training\/production-planner-certificate\/\"><strong>planner<\/strong> <\/a>and the\u2019<a href=\"https:\/\/ncacademy.ch\/en\/training\/production-scheduler-certificate\/\"><strong>scheduler<\/strong><\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The planner focuses primarily on balancing orders, resources and the company\u2019s capacity. The scheduler organises the execution of operations on the shop floor. Their roles are complementary, although the division of responsibilities varies depending on the size and structure of the organisation.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is a production planner?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>production planner<\/strong> converts sales forecasts and confirmed orders into a workable production plan. It determines what needs to be produced, in what quantities and when.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">His work generally spans several weeks or several months. It takes into account the availability of staff, machinery, raw materials, components and storage capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He works closely with the sales, procurement, logistics and production teams. His aim is to develop a programme that is consistent with the commitments made to customers and the resources actually available.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What are the planner\u2019s responsibilities?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Their responsibilities vary depending on the company, but they generally include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analysing requirements:<\/strong> to analyse orders, sales forecasts and consumption figures in order to estimate the volumes to be produced.<\/li>\n\n\n\n<li><strong>Assessing workload and capacity:<\/strong> compare the planned workload with the availability of machinery, teams and workstations.<\/li>\n\n\n\n<li><strong>Planning supplies:<\/strong> check that the raw materials and components will be available when needed.<\/li>\n\n\n\n<li><strong>Co-ordinating services:<\/strong> align priorities with the sales, procurement, logistics and production departments.<\/li>\n\n\n\n<li><strong>Anticipating risks:<\/strong> identify overloads, risks of failure and deadlines that are difficult to meet.<\/li>\n\n\n\n<li><strong>Follow the results:<\/strong> compare forecasts with actual output in order to improve future plans.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When a gap emerges between needs and capacity, the planner may suggest reviewing priorities, spreading the workload over a longer period, or mobilising additional resources.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is a production scheduler?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The\u2019<strong>production scheduler<\/strong> plays a more hands-on role in day-to-day operations. It translates the overall programme into practical tasks for the production teams.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It determines which production orders are to be initiated, in what order, and on which equipment. Its time horizon is shorter: a few hours, several days or, in some cases, a week.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He works mainly with workshop managers, operators, the maintenance team and the quality assurance department. He must be familiar with the manufacturing processes, the limitations of the machinery and the skills required for each operation.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What are the scheduler\u2019s responsibilities?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The scheduler handles a number of operational tasks:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Organising production orders:<\/strong> determine the order in which tasks are carried out, based on priorities and available resources.<\/li>\n\n\n\n<li><strong>Allocate resources:<\/strong> check which machines, materials and people can be mobilised.<\/li>\n\n\n\n<li><strong>Launch operations:<\/strong> to forward production orders and the necessary information to the workshop.<\/li>\n\n\n\n<li><strong>Track progress:<\/strong> check that operations are proceeding according to schedule.<\/li>\n\n\n\n<li><strong>Dealing with the unexpected:<\/strong> adjust priorities in the event of a breakdown, absence, delay or quality issue.<\/li>\n\n\n\n<li><strong>Report discrepancies:<\/strong> report real-time updates, delays and any difficulties encountered to the planner.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">His job involves adapting the programme to the realities on the ground, whilst keeping an eye on deadlines and other ongoing projects.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Planner and scheduler: the main differences<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Both functions are designed to ensure smooth production, but they operate at different levels.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Criterion<\/strong><\/td><td><strong>Planner<\/strong><\/td><td><strong>Scheduler<\/strong><\/td><\/tr><tr><td><strong>Horizon<\/strong><\/td><td>Several weeks or months<\/td><td>A few hours to a week<\/td><\/tr><tr><td><strong>Vision<\/strong><\/td><td>Comprehensive and cross-cutting<\/td><td>Detailed and practical<\/td><\/tr><tr><td><strong>Objective<\/strong><\/td><td>Balancing needs and capabilities<\/td><td>Organising the execution<\/td><\/tr><tr><td><strong>Decisions<\/strong><\/td><td>Volumes, workload, resources and deadlines<\/td><td>Launch, running order and priorities<\/td><\/tr><tr><td><strong>Contacts<\/strong><\/td><td>Sales, purchasing, logistics and production<\/td><td>Workshop, maintenance and quality<\/td><\/tr><tr><td><strong>Tools<\/strong><\/td><td>ERP, forecasts and workload plans<\/td><td>ERP, MES, APS and order tracking<\/td><\/tr><tr><td><strong>Unforeseen circumstances<\/strong><\/td><td>Capacity or supply risks<\/td><td>Breakdowns, absences and day-to-day emergencies<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This division of responsibilities is not the same everywhere. In some SMEs, a single person may be responsible for planning and scheduling. In a larger company, these responsibilities are often shared amongst several roles.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How do the two professions work together?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The planner provides a general framework: production volumes, scheduled periods and available capacity. The scheduler then converts this framework into a daily schedule for the workshop.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Information also flows in the other direction. If a machine is producing more slowly than expected or if a component is missing, the scheduler adjusts the immediate priorities and passes on the situation to the planner. The planner can then revise the next forecasts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let\u2019s take the example of a breakdown in a key piece of equipment. The scheduler moves certain operations to another machine or changes the order of the tasks. The planner then assesses the impact on upcoming orders and, if necessary, adjusts the overall schedule.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What skills do you need to develop?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Both roles require a good understanding of <strong>industrial flows<\/strong>, stock levels and production constraints.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Skills required of a planner<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>data analysis and forecasting; ;<\/li>\n\n\n\n<li>assessment of workload and capacity; ;<\/li>\n\n\n\n<li>use of a <strong>ERP<\/strong> and Excel; ;<\/li>\n\n\n\n<li>understanding of stock and procurement; ;<\/li>\n\n\n\n<li>coordination between several departments; ;<\/li>\n\n\n\n<li>the ability to anticipate the consequences of a decision.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Scheduler capabilities<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>a good knowledge of the workshop; ;<\/li>\n\n\n\n<li>understanding of manufacturing processes; ;<\/li>\n\n\n\n<li>prioritisation; ;<\/li>\n\n\n\n<li>ability to respond to unforeseen circumstances; ;<\/li>\n\n\n\n<li>monitoring of production orders; ;<\/li>\n\n\n\n<li>communication with teams in the field.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Attention to detail and communication are important in both roles. Incorrect data or a miscommunicated priority can cause delays at various stages.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Which career should I choose?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The choice depends mainly on your working style and your experience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <strong>planning<\/strong> might be more to your liking if you enjoy:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>analyse data; ;<\/li>\n\n\n\n<li>anticipate needs; ;<\/li>\n\n\n\n<li>take several weeks or several months to complete; ;<\/li>\n\n\n\n<li>coordinate various departments; ;<\/li>\n\n\n\n<li>strive to strike a balance between demand and capacity.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The\u2019<strong>scheduling<\/strong> might be more suitable if you enjoy:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>proximity to the workshop; ;<\/li>\n\n\n\n<li>quick decisions; ;<\/li>\n\n\n\n<li>day-to-day organisation; ;<\/li>\n\n\n\n<li>solving practical problems; ;<\/li>\n\n\n\n<li>regular contact with the production teams.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These two roles can also form part of the same career path. Experience in scheduling can facilitate a move into planning, as it provides a good understanding of actual capacities and constraints.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Are you torn between the two courses?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Take a look at the two NCAcademy courses to find the one that best suits your experience and your way of working.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/ncacademy.ch\/en\/training\/production-scheduler-certificate\/\"><strong>Find out more about the Production Workshop Manager (Scheduler) Certificate<\/strong><\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/ncacademy.ch\/en\/training\/production-planner-certificate\/\"><strong>Find out about the Certificate in <\/strong><br><strong>Production Planner<\/strong><\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How can you get into these careers in Switzerland?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There is no single career path. Experience in production, logistics, processes or workshop management often provides a useful foundation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are several possible approaches:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Internal promotion:<\/strong> An experienced operator, team leader or technician can progress into a role in scheduling.<\/li>\n\n\n\n<li><strong>A technical or logistics CFC:<\/strong> for example, in logistics, mechanical engineering or another industrial sector.<\/li>\n\n\n\n<li><strong>Continuing professional development:<\/strong> It enables you to complement your practical experience with knowledge of planning, stock management and processes.<\/li>\n\n\n\n<li><strong>Higher education:<\/strong> Some roles may require a diploma from a vocational college (ES) or a university of applied sciences (HES), or a qualification in industrial engineering.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Expectations depend on the sector, the size of the company and the level of responsibility involved in the role.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Your experience may already provide a solid foundation. Take a look at <a href=\"https:\/\/ncacademy.ch\/en\/training\/\">the courses offered by NCAcademy<\/a> to find the course that suits your project.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What are the salaries like in Switzerland?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Remuneration varies according to experience, qualifications, canton, industry sector and the scope of the role. A role combining planning, scheduling and management may be remunerated differently from a more specialised role.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sources available for this article mainly present European trends or general information on supply chain roles. They do not allow for an accurate comparison of Swiss salaries for the two roles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To get a realistic estimate, it is best to compare recent job offers that match the canton, sector and exact job title.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Learning whilst continuing to work<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Digital tools and data analysis are playing an increasingly important role in production management. Continuing professional development enables professionals to gain a deeper understanding of planning and scheduling methods whilst continuing to work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NC Academy offers two programmes combining distance learning, support and face-to-face training sessions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the <strong>Production Planner Certificate<\/strong> ;<\/li>\n\n\n\n<li>the <strong>Certificate in Production Workshop Management (Scheduler)<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These training courses are aimed at professionals who wish to develop their skills whilst continuing to work.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Choose the programme that suits your project<\/strong><\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/ncacademy.ch\/en\/training\/production-scheduler-certificate\/\"><strong>Find out more about the Production Workshop Manager (Scheduler) Certificate<\/strong><\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/ncacademy.ch\/en\/training\/production-planner-certificate\/\"><strong>Find out about the Certificate in <\/strong><br><strong>Production Planner<\/strong><\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>planner<\/strong> and the\u2019<strong>scheduler<\/strong> operate at two complementary levels. The first anticipates needs and seeks to strike a balance between orders and capacity. The second organises day-to-day operations and adapts priorities to the reality on the shop floor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the company, these responsibilities may be separate or combined within a single role. Understanding the differences between them helps you make a more informed choice about your career path, training or next career move.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Frequently Asked Questions<\/strong><\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-question-1786713037820\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\"><strong>Can the planner and the scheduler be the same person?<\/strong><\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Yes. In some small and medium-sized enterprises, a single person may be responsible for drawing up the overall plan and organising day-to-day operations.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786713049665\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\"><strong>Which profession is most closely related to the workshop?<\/strong><\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The scheduler generally works more closely with operators, team leaders, maintenance staff and the quality team.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786713055923\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\"><strong>Can we move from scheduling to planning?<\/strong><\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Yes. Practical experience gained in scheduling can help to draw up more realistic plans.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786713064346\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\"><strong>Which tools do you need to be proficient in?<\/strong><\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Excel and ERP systems are frequently used. Depending on the company, MES or APS software may also be used.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786713069915\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\"><strong>Will artificial intelligence replace these jobs?<\/strong><\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Digital tools can automate certain calculations and facilitate simulations. However, decision-making, communication and the management of unforeseen events remain important.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Sources used<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Amalo Recruitment, <em>Dispatcher: job profile, duties, training and salary 2026<\/em>, 2026.<\/li>\n\n\n\n<li>ANAV, <em>Planning and scheduling in the construction industry: differences and tools<\/em>, 2024.<\/li>\n\n\n\n<li>Astr\u00e9e Software, <em>What is the difference between scheduling and production planning?<\/em>, undated.<\/li>\n\n\n\n<li>HRMCO Partners, <em>Production Planner: Responsibilities, Skills and Salary<\/em>, undated.<\/li>\n\n\n\n<li>Visiativ, <em>MES, ERP, APS: differences and complementarities in industry<\/em>, 2026.<\/li>\n\n\n\n<li>1Life, <em>Production planning or scheduling: which solution should you choose?<\/em>, undated.<\/li>\n\n\n\n<li>Batna 2 University, <em>Part I: Production Planning \u2013 General Information<\/em>, undated.<\/li>\n\n\n\n<li>\u00c9cole de technologie sup\u00e9rieure de Montr\u00e9al, <em>Integration of simulation and optimisation to support decision-making<\/em>, 2006.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Dans une entreprise industrielle, une panne, un retard de livraison, une absence ou une commande urgente peut rapidement perturber le programme pr\u00e9vu. Deux fonctions interviennent alors pour maintenir la production : le planificateur et l\u2019ordonnanceur. Le planificateur travaille principalement sur l\u2019\u00e9quilibre entre les commandes, les ressources et les capacit\u00e9s de l\u2019entreprise. L\u2019ordonnanceur organise l\u2019ex\u00e9cution des [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2798,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2797","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/posts\/2797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/comments?post=2797"}],"version-history":[{"count":3,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/posts\/2797\/revisions"}],"predecessor-version":[{"id":2801,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/posts\/2797\/revisions\/2801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/media\/2798"}],"wp:attachment":[{"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/media?parent=2797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/categories?post=2797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ncacademy.ch\/en\/wp-json\/wp\/v2\/tags?post=2797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}